Monday, October 24, 2016

Filling in the door

We had a Saturday that actually didn't have a race or a soccer game, so Bryan filled in the door to our bedroom that was in the hall by the laundry room.  You now enter our bedroom from the door that was to the office.  Confused yet?

He started by taking the molding off.  Ethan helped with this part.


Bryan then built a frame that would fit in the doorway so he would have something to nail the drywall to.  We realized that I am a pretty good aim with a hammer!


There it is.


Bryan cut some drywall to fit the hole and we put it on our bedroom side of the wall.  We are going to put a toilet where the X is on the floor and then put in a wall to make a little 1/2 bath.  Because of this, we didn't finish the other side of the doorway-now-a-wall.

We need to finish the other part of the wall (as you can see in the photo) and then we can paint and finish up.  It is coming together.


No comments: