Day 2 of flooring started off kind of crazy. We had this hallway that was tricky. The flooring is only installed in one direction but this bit had to be installed to the long hallway part. Bryan had to do a bunch of math to figure out how much to cut off the first board so it would all link together without a gap. It was crazy and a bit frustrating but he got it figured out and it worked perfectly.
This is a look down the hallway that shows where the smaller bit met the large planks that were coming from the main room.
No comments:
Post a Comment